Farmland Maintenance (Dakhla) from 7th to 11th May – Dakhla Survey Report (May 2026)

Farmland Maintenance (Dakhla)

Japanese researchers assisted with maintenance at experimental farmland contracted in Mushia (Atef’s farmland) and Rashda (Gibril’s farmland).


May 7–10 – Mushia: Sprinkler system installed. Despite rupture of an old shallow well pipe, irrigation was successfully confirmed.

May 7–10 – Mushia

May 7–10 – Mushia

May 7–10 – Mushia

May 7–10 – Mushia


May 11 – Rashda: Soil moisture sensors installed under Dr. Masaru Mizoguchi’s supervision. Agreement reached to provide regular sensor data reports.

May 11 – Rashda

May 11 – Rashda

Scroll to Top